South Windsor detention basin rehab

Project type

storm water management

Date

May 2026

Location

South Windsor

This project was a challenging, but we worked closely with the C.T D.O.T for discharge purposes and the town of South Windsor. We re-engineered a beautiful system. That was horribly constructed in the 1980s. the invert tolerances were almost level by 3 sides. In the end we developed a cost effective and aesthetically pleasing long term solution for are customer. Storm water solutions do not need to be an eyesore.